Installations and equipment

Category: Projects

Project:Implementation operations of base and pavement construction, construction of container storage and infrastructural installations (including installation and electrical canals, cable laying, pipe laying …) complete refurbishment and renovation of electrical posts, swage, drinking water and fire network and installations, in port areas of Ports and Sailing General Office of Gilan Province

• Starting date: May, 2008

• Contract Period: 18 months

• Client: Ports and Sailing General Office of Gilan Province

• Consultant: Atech Consulting Engineers

------------------------------------------------------------

Project: Implementation operations of development and completion of projects for base and pavement construction, infrastructural facilities, structures . . . in port areas of Ports and Sailing General Office of Gilan Province

Implementation operations consisting of excavation and construction of base and asphalt pavement and canals and new extents in eastern extreme of the port with 4.5 hectar of area, complementary operations of base and pavement construction in operational areasof the port with approximate area of 15 hectar, and construction and completion of roads and canals in those areas, in addition, completion of installation operations in the area including completion of water supply and fire network and installation of towers and hydrants, also implementing complete construction and installation operations of ground tank (400m3) and elevated tank (50m3) of water, Guard and customs building (with area of 600 m2) and emergency building (with area of 350m2).

• Starting date: May, 2008

• Contract Period: 24 months

• Client: Ports and Sailing General Office of Gilan Province

• Consultant: Atech Consulting Engineers

------------------------------------------------------------

Project: Implementation operations of development and completion of projects for base and pavement construction and infrastructural installations of structures and construction of two transit cargo storages forPorts and Sailing General Office of Gilan Province

Implementing construction of base and asphalt pavement on about 14 hectar of the lands  within the port area including the main port area and adjacent areas in western break wall, installation of electrical posts, lighting towers, hydrants, fire system, installation and electrical canals and construction of two transit cargo storages with area of 20000 m2 of steel shed

• Starting date: September, 2011

• Contract Period: 30 months

• Client: Ports and Sailing General Office of Gilan Province

• Consultant: Atech Consulting Engineers