Water Works

Category: Projects

Project: Construction of western break wall of Caspian Port Complex

Construction of western break wall of Caspian Port Complex locating in Anzali Free Industrial and Trade Zone, including: Making mining faces in stone quarries and quarry of various stones, separation and storage of various stones in specific areas, lading, transporting and emplacing stone materials in break wall layers, production of different types of concrete armors, lading, transporting and emplacing concrete armorsin break wall sections

• Starting date: July, 2009

• Contract Period: 32 months

• Client: Anzali Free Industrial and Trade ZoneOrganization

• Consultant: Fara Darya Arsheh Consulting Engineers

--------------------------------------------------------------------

Project: construction of break walls, dredging and land extraction in Jafreh Fishery port

Construction of new pond with area of 12 hectar as a stone break wall (the length of main break wall is 1100 m and the secondary one is of 460 m length) 

Dismantling some parts of existing break walls up to -2 elevation and refurbishment of existing pond and dredging it down to -2m elevation compared to base elevation and dumping in the location of land extraction (dredging volume about 65000 m3)

Land extraction from the sea in order to provide necessary land for landscaping, buildings and facilities (area o about 20000 m2)

Supply and installation of navigation signs and bollards on break walls

• Starting date: June, 2011

• Contract Period: 36 months

• Client: Iranian Fishery Organization

• Consultant: Water and Energy Jahad Research Company

--------------------------------------------------------------------

Project: Construction of Irrigation and drainage network of downstream lands of Qeyqaj Storage Dam-  2nd reconstructive unit 

Construction of 1st and 2nd grade main canals with approximate length of 16 km, construction of internal dividing drain with approximate length of 25 km, construction of 2nd grade drain with approximate length of 12 km, construction of technical structures of canals and drains, construction of service and maintenance roads and motorable bridges, implementing drilling and grouting operations of Qeyqaj Storage Dam.

• Starting date: November, 2012

• Contract Period: 24 months

• Client: West Azarbaijan Regional Water Company

• Consultant: Zistab Consulting Engineers

--------------------------------------------------------------------

Project: Dredging of the pond in Lavar Saheli Fishery Port

• Starting date: August, 2015

• Contract Period: 12 months

• Client: Fishery General Office of Booshehr Province

• Consultant: Water and Energy Jahad Research Company

--------------------------------------------------------------------

Project: Construction of a multi- purpose dock in Caspian Port Complex

Construction of a permanent stone dyke, construction of a temporary dyke, construction of the dock using secant concrete pile, building a retaining wall behind the dock in order to support the slope, including compacting sections and profiles and installing tie rods and dead- mans, supply and installation of all dock accessories such as bollards, fenders and facility canals ..., dismantling temporary dyke and dredging under the dock seaside, supply, transportation and installing mechanical and electrical installations relating to the dock including lighting system on dock, water supply system to boats, power supply for boats, fire system and surface water drainage

• Starting date: June, 2015

• Contract Period: 18 months

• Client: Anzali Free Industrial and Trade ZoneOrganization

• Consultant: Fara Darya Arsheh Consulting Engineers

--------------------------------------------------------------------

Project: Construction of dock, access road, landscaping and support buildings for Khoorkhan Fishery port

Construction of dock for unloading fishing products and lading provisions, of centrifuge concrete pile and concrete dock for landing of fishery boats with length of 50 m and width of 14m along with all landing accessories such as fenders, bollards, etc. and construction of a shading of space structure type on the dock, with area of 528 m2 and dimensions of 48*11*5m with 1.5 m cantilever on each side and access road of centrifuge concrete pile and concrete dock with length of 140 m and width of 9m

Construction of stone access road and Land extraction with volume of 30000 m3

Construction of buoyant docks along with access bridge for landing and parking of fishing boats with fenders and bollards and other accessories

Construction of support buildings onshore the port with area of 1000m3, shading for fishing nets and ropes with area of 630 m2 and dimensions of 45*14*5m with 1.5 m cantilever on each side

Landscaping and construction of access roads including earth-works, construction of base and pavement, surface water collecting system, and infrastructural installations and the port enclosing walls

Supply of equipment and construction of supporting facilities onshore including fuel storage tank, gas station, ground and elevated water tanks, water supply facilities and network, fire facilities and network, power supply facilities and network for buildings and lighting of landscape and docks.

• Starting date: February, 2015

• Contract Period: 36 months

• Client: Iranian Fishery Organization

• Consultant: Water and Energy Jahad Research Company